• HOME
  • ·
  • ABOUT

    ABOUT

    MORE +
    ABOUT
    In recent years, our company has been cooperating with the power construction company to mainly install the boiler body and equipment and pipelines within the range of the steam engine. Whether it is quality, progress, safety, and post-completion services, it has been unanimously praised by the owners and Party A, and has been rated as an advanced collective in quality, safety and civilized construction many times. During the construction process, our company cooperated very closely with the owner and the supervision company to establish a good image of the company.
  • ·
  • case
  • ·
  • Performance
  • ·
  • Honors
  • ·
  • news
  • ·
  • Contact
  • ·
  • 中文

13375627979Manager Zhai

"Domestic projects"
Guiyun Construction

About| Performance| Contact

Your current location:Shandong Guiyun Construction Engineering Co., Ltd. >> Company performance >> Domestic projects

The main project (Section B) of the expansion project of Guoneng Shenwan Chizhou Power Generation Co., Ltd. Phase II (2 × 660MW units) includes theinstallation

Contract Name: Installation Project of Six Major Pipelines, Medium and Low Pressure Pipelines - Steam System for Phase II (2 × 660MW Units) Expansion Project (Section B) of Guoneng Shenwan Chizhou Power Generation Co., Ltd

Contract amount: 6564350 yuan

Construction unit: China Electric Power Construction Group Hebei Engineering Co., Ltd



The main project (Section B) of the expansion project of Guoneng Shenwan Chizhou Power Generation Co., Ltd. Phase II (2 × 660MW units) includes theinstallation


The main project (Section B) of the expansion project of Guoneng Shenwan Chizhou Power Generation Co., Ltd. Phase II (2 × 660MW units) includes theinstallation


The main project (Section B) of the expansion project of Guoneng Shenwan Chizhou Power Generation Co., Ltd. Phase II (2 × 660MW units) includes theinstallation