• HOME
  • ·
  • ABOUT

    ABOUT

    MORE +
    ABOUT
    In recent years, our company has been cooperating with the power construction company to mainly install the boiler body and equipment and pipelines within the range of the steam engine. Whether it is quality, progress, safety, and post-completion services, it has been unanimously praised by the owners and Party A, and has been rated as an advanced collective in quality, safety and civilized construction many times. During the construction process, our company cooperated very closely with the owner and the supervision company to establish a good image of the company.
  • ·
  • case
  • ·
  • Performance
  • ·
  • Honors
  • ·
  • news
  • ·
  • Contact
  • ·
  • 中文

13375627979Manager Zhai

"Domestic projects"
Guiyun Construction

About| Performance| Contact

Your current location:Shandong Guiyun Construction Engineering Co., Ltd. >> Company performance >> Domestic projects

Installation and construction project of smoke and air system and denitrification system on the right side of boiler # 1 in the 2x600MW power generation project

Contract Name: Installation and Construction Project of Smoke and Air System and Denitrification System on the Right Side of Boiler # 1 in the 2x600MW Power Generation Project of Xinjiang Bingzhun Xinhong Energy Co., Ltd

Contract amount: 6804866 yuan

Construction unit: China Power Construction Corporation Nuclear Power Engineering Co., Ltd




Installation and construction project of smoke and air system and denitrification system on the right side of boiler # 1 in the 2x600MW power generation project


Installation and construction project of smoke and air system and denitrification system on the right side of boiler # 1 in the 2x600MW power generation project


Installation and construction project of smoke and air system and denitrification system on the right side of boiler # 1 in the 2x600MW power generation project