• HOME
  • ·
  • ABOUT

    ABOUT

    MORE +
    ABOUT
    In recent years, our company has been cooperating with the power construction company to mainly install the boiler body and equipment and pipelines within the range of the steam engine. Whether it is quality, progress, safety, and post-completion services, it has been unanimously praised by the owners and Party A, and has been rated as an advanced collective in quality, safety and civilized construction many times. During the construction process, our company cooperated very closely with the owner and the supervision company to establish a good image of the company.
  • ·
  • case
  • ·
  • Performance
  • ·
  • Honors
  • ·
  • news
  • ·
  • Contact
  • ·
  • 中文

13375627979Manager Zhai

"Foreign projects"
Guiyun Construction

About| Performance| Contact

Your current location:Shandong Guiyun Construction Engineering Co., Ltd. >> Company performance >> Foreign projects

ThalNova Power Station Project, Phase II, Block II, Thar Coalfield, Pakistan

Project Name: ThalNova Power Station Project, Phase II, Block II, Thar Coalfield, Pakistan

Scope of Contracting: Installation of wall mounted overheating system. Installation of economizer system, low-temperature reheater system, high-temperature reheater system, corresponding system suspension device installation, sulfurization air system, boiler body pipeline, and corresponding system defect handling

Start and completion date: May 15th, 2022- December 30th, 2022

Contract amount: 8816000 yuan

Project owner: China Electric Power Construction Group Hebei Engineering Co., Ltd


ThalNova Power Station Project, Phase II, Block II, Thar Coalfield, Pakistan


ThalNova Power Station Project, Phase II, Block II, Thar Coalfield, Pakistan


ThalNova Power Station Project, Phase II, Block II, Thar Coalfield, Pakistan


ThalNova Power Station Project, Phase II, Block II, Thar Coalfield, Pakistan

Previous article:Bahrain Aluminum Plant Self owned Power Plant Project
Next article:没有了