    In recent years, our company has been cooperating with the power construction company to mainly install the boiler body and equipment and pipelines within the range of the steam engine. Whether it is quality, progress, safety, and post-completion services, it has been unanimously praised by the owners and Party A, and has been rated as an advanced collective in quality, safety and civilized construction many times. During the construction process, our company cooperated very closely with the owner and the supervision company to establish a good image of the company.
  • ·
  • case
  • ·
  • Performance
  • ·
  • Honors
  • ·
  • news
  • ·
  • Contact
  • ·
  • 中文

13375627979Manager Zhai

"News"
Guiyun Construction

About| Performance| Contact

Your current location:Shandong Guiyun Construction Engineering Co., Ltd. >> News

Fire protection facility construction process

1. Construction of automatic fire alarm system

(1) Wiring: According to the design requirements, carry out the wiring of the fire automatic alarm system to ensure the safety and reliability of the circuit.

(2) Equipment installation: Install fire detectors, manual alarm buttons, fire alarm controllers, and other equipment.

(3) Debugging: Debug the automatic fire alarm system to ensure its normal operation.

2. Construction of automatic fire extinguishing system

(1) Pipe laying: According to the design requirements, lay pipes for the automatic fire extinguishing system to ensure the safety and reliability of the pipeline.

(2) Equipment installation: Install nozzles, fire pumps, fire water tanks, and other equipment.

(3) Debugging: Debug the automatic fire extinguishing system to ensure its normal operation.

3. Construction of smoke prevention and exhaust system

(1) Pipe laying: According to the design requirements, lay pipes for the smoke prevention and exhaust system to ensure the safety and reliability of the pipeline.

(2) Equipment installation: Install smoke exhaust fans, fire dampers, smoke exhaust vents, and other equipment.

(3) Debugging: Debug the smoke prevention and exhaust system to ensure its normal operation.

4. Construction of evacuation indication system

(1) Wiring: According to the design requirements, carry out the wiring of the evacuation indication system to ensure the safety and reliability of the line.

(2) Equipment installation: Install evacuation indicator lights, emergency lighting, and other equipment.

(3) Debugging: Debug the evacuation indication system to ensure its normal operation.

5. Construction of emergency lighting system

(1) Wiring: Install emergency lighting system wiring according to design requirements to ensure safe and reliable wiring.

(2) Equipment installation: Install emergency lighting, emergency power supply and other equipment.

(3) Debugging: Debug the emergency lighting system to ensure its normal operation.